RenovaTech
Villa renovation and construction in Calpe

Calpe · Costa Blanca

Villa renovation and construction in Calpe

Full renovations of villas and apartments. We send a weekly report with photos and video, work to a fixed-price quote and deal with permits and the town hall for you.

Calpe mixes seafront apartments with villas in Maryvilla, Cucarres, La Canuta and Empedrola, many with views of the Peñón and in need of updating.

We do full renovations, terraces and outdoor spaces, kitchens and bathrooms, and holiday-rental makeovers to improve returns.

Seafront apartments: salt runs the job

A lot of what we renovate in Calpe are apartments with a view of the Peñón, and there the enemy is salt-laden damp: corroded external joinery, rusted railings, open terrace joints and aluminium that no longer closes. The building envelope should be sorted before touching the interior — if the terrace still leaks, a new bathroom lasts until the first serious downpour.

Owners' association and holiday lets

Almost no job in a Calpe building is decided inside your flat alone: façade, downpipes and terraces are usually communal, and the association has to approve the work. We deal with that process. And if the flat is a holiday let, we plan the works around the low season and specify materials that survive turnover rather than the ones that photograph best.

Services in Calpe

  • Full renovations of villas and apartments
  • Turnkey villa construction
  • Kitchens and bathrooms
  • Interior design with 3D proposals
  • Home automation and efficient climate control
  • Holiday rental makeovers

If you live outside Spain

We send a weekly report with photos and video, work to a fixed-price quote and deal with permits and the town hall for you. Service in English and Spanish.

Recent work

Contemporary living roomBlack kitchen with white worktopBathroom with slats and LED mirrorPool and roof, aerial viewTaupe kitchenBathroom with towel radiator

What people ask us before starting

The flat is in a block. What permissions are needed?

Inside the property, a declaración responsable at the town hall. But façade, terrace and drainage stacks are usually communal and need the owners' association to agree. We request that and work within the building's permitted hours.

I let the apartment. How long will it be out of service?

It depends on the scope, but we plan it backwards: the handover date first, then the trades. We work in the low season with a completion date fixed by contract, because every week of works is a week without a booking.

Have a renovation in mind?

WhatsAppGet price